Field record
Where we've worked
Recent work for mining and exploration companies, from Oyu Tolgoi in the South Gobi to the mountains of Gobi-Altai and Zavkhan.
- Shown
- 8 of 243 projects
- Extent
- 41.6–52.1° N, 87.7–119.9° E
- Projection
- Equirectangular, simplified
Drag to turn · hover a pin
Project list
Umnugobi · Copper-Gold
Gravity survey at Oyu Tolgoi
Ground gravity survey for Oyu Tolgoi LLC at the Oyu Tolgoi copper-gold operation in the South Gobi.
Gobi-Altai · Cu-Ni-PGE, Cu-Au
Gravity and magnetics at Oval and Maikhan Uul
Ground gravity and magnetic surveys for Asian Battery Metals over the Oval copper-nickel discovery and the neighbouring Maikhan Uul copper-gold VMS project in Gobi-Altai.
Zavkhan · VMS Cu-Au
IP, magnetics and gravity at Zos Uul
Induced polarisation, ground magnetic and gravity surveys for Western Mongolian Development (WMD) over the Zos Uul VMS copper-gold deposit, Durvuljin soum, Zavkhan.
Selenge · Gold
Magnetics, gravity and IP at Boroo
Ground magnetics, gravity and IP surveys for Centerra Gold at Boroo, Mongolia's first hard-rock gold mine.
Selenge · Gold
Magnetics and IP at Gatsuurt
Ground magnetics and IP surveys for Centerra Gold over the Gatsuurt gold deposit, east of Boroo.
Dornod · Gold-Silver
Exploration and water surveys at Altan Tsagaan Ovoo
Ground magnetics, gravity and IP for gold exploration, plus water exploration, for Centerra Gold Mongolia at the ATO deposit in Dornod.
Zavkhan · Gold-Copper
Exploration and water surveys at Bayan Airag
Ground magnetics and IP for gold exploration, plus water exploration, for Bayan Airag Exploration LLC in western Zavkhan.
Umnugobi · Copper-Gold
Gravity and IP at Kharmagtai
Ground gravity and IP surveys for Xanadu Mines over the Kharmagtai copper-gold porphyry district in the South Gobi.

Field · 01
The crew
Small teams, long seasons. Most of our geophysicists started out on a crew like this one.
Case studies
Send us a licence boundary.
A shapefile or a sketch on a map is enough. Tell us what you're looking for and we'll come back with a method, line spacing and price, usually within two working days.
Start a quote→